Temporary Fencing Supports

Over the course of time, our company has turned into progressing provider of Temporary Fence Supports. This hand soldered with hot dive energized covering, our fencing boards are designed for prolong life and standard use. They meet a negative to climb weld work infill as well as are totally hot dove mixed to Australian Standards. Exactly when used as a piece of conjunction with our concrete or plastic Fence Feet, stays and clamps, it makes an intact Temporary Fencing System, which is especially consistent, adaptable and fiscally wise. We maintain kilometers of our fencing system in stock at all conditions, so can provide customers as they required.

Open ground installation :

Step 1

Ground planning : Generally next to no ground readiness is required as our system will be protected in most ground surfaces and sorts. Yet, don't introduce SFTFSS on free soils, for example, the highest point of recently put windrows, until they are adequately compacted.

Step 2

Inspect for underground links : Our screw pillars are purposefully planned to infiltrate subterranean 400 mm. This places the base of the screw over any lawfully introduced electrical links, which ought to be at 450mm from base to top of link. Moreover, we suggest utilizing Ground Penetrating Radar (or comparable advancement) when you are unverifiable of the area of electrical link installations.

Step 3

Lay out boards : On the expected fence line with the base of the boards along the last area

Step 4

Install screw posts : Using a Stihl 130 Post Hole Digger and attachments supplied, screw the posts into the ground at the necessary locations. It is best practice to install 4 or 5 screw posts and then install the panels to ensure the centres are correct.

Step 5

Introduce screw posts : Using a Stihl 130 pillar Hole Digger and auxiliaries provided, screw the pillars into the base at the essential areas. It is optimum practice to introduce 4 or 5 screw pillars and afterward introduce the boards to guarantee the means are right

Step 6

Introduce panels : Pivot the head plate to the sought place and lift the board onto the head plate as well as over the settling pin.

Step 7

Introduce connector sections : Install the coupling sections to the highest point of the boards and fix.

Step 8

Introduce propping : Place the supporting and introduce with coupling sections. See figure 5 Install the supporting screw according to Step 4 Fit the propping over the stick on supporting screw and settle with a clevis stick.

Concrete curb of footpath installation :

Step 1

Introduce panels : Pivot the head plate to the sought place and lift the board onto the head plate as well as over the settling pin.

Step 2

Introduce head plates : Position the head plate in the demanded area and bore a 6mm gap into the solid curb. Introduce a 6mm Thunderbolt via the head plate and into the solid curb.

Step 3

Introduce boards : Once the main top plate is introduced fit the board and settle the following head plate into the base of the board. Find the head plate and board in the right area and afterward settle the top plate to the control according to Step 2

Step 4

Introduce connector sections : Install the coupling sections to the highest point of the boards and fix.

Bitumen driveway of road surface :

Step 1

Lay out panels : Lay out the panels on the intended fence line with the bottom of the panels along the final location

Step 2

Install top plates : Place the top plate in the required location and drill a 8mm coach screw through the hole in the top plate

Step 3

Introduce connector sections : Install the coupling sections to the highest point of the boards and fix.

Limestone or hard ground installation :

Step 1

Lay out panels : Lay out the panels on the intended fence line with the bottom of the panels along the final location

Step 2

Introduce screw posts : Using a Stihl 130 pillar Hole Digger and auxiliaries provided, screw the pillars into the base at the essential areas. It is optimum practice to introduce 4 or 5 screw pillars and afterward introduce the boards to guarantee the means are right

Step 3

Install top plates : Place the top plate in the required location and drill a 8mm coach screw through the hole in the top plate

Step 4

Install panels : Swivel the top plate to the desired position and lift the panel onto the top plate and over the fixing pin.

Step 5

Introduce connector sections : Install the coupling sections to the highest point of the boards and fix.


SCREW FENCING PTY LTD

Contact Us

( *represents compulsory fields )

Tips on getting accurate quotes. Please include product name, order quantity, usage, special requests if any in your inquiry.



SCREW FENCING PTY LTD All Rights Reserved.